6.
Insert the DC cables through the appropriate knockout and
into the DC wiring raceway.
7.
Torque the DC cable mounting bolts to 105 inch pounds.
Re-torque after 30 days.
8.
Inspect the DC cable compartment to be sure no copper
wire fragments are present after tightening cables.
9.
Route the negative DC cable to the DC source disconnect
(or Vanner DCM). Verify cable polarity before proceeding.
Warning
If the cables are reversed, the fuse will be blown and inverter can
be damaged.
10.
Route the positive DC input cable to the DC disconnect.
Protect cables with loom and use grommets or other
appropriate means where cables may contact hard, sharp
edges. If possible, make the last DC connection at the
disconnect to avoid causing a spark at the battery.
11.
If any of the control NC or NO outputs need to be wired,
for control of external devices, do so at this time.
12.
Route the control NC or NO wiring with as much physical
separation as possible from low voltage wiring such as
audio and video signal wires, the Input DC wiring, and AC
wiring. This is accommodated in the system through the
physical separation of the High Current DC knockouts and
the Control knockouts for the DC Raceway.
13.
Verify that the control NC or NO wiring is still
disconnected from the device to which they are to be
attached.
14.
Insert control NC or NO wiring through the knockout and
into the DC wiring raceway.
15.
Connect the NO, NC, Common, and +24VDC and GND to
the appropriate terminals in the terminal strip and torque
each of the AC terminal screws to 4 inch pounds. Re-
torque after 30 days.
16.
Verify DC wiring installation. Verify that all connections
are tight. Secure all wiring and replace the DC Raceway
cover.